The Town of Milton has announced that the construction at Kennedy Circle and Louis St. Laurent has been extended.
In a post online, the Town says the reason for the extension was ‘circumstances out of our control’. A further reason was not provided.
The Town is constructing roundabouts on Louis St. Laurent Avenue at Kennedy Circle (west intersections) and Louis St Laurent Avenue at Kennedy Circle (east intersection).
- COVID-19: Construction sites taking precautions as they return to work
- COVID-19: Lunch Box Challenge takes over Milton construction sites
According to the Town’s website, the road closure has been extended to Monday, September 14th.
Due to circumstances out of our control, the road closure Kennedy Circle at Louse St. Laurent has been extended. Learn More: https://t.co/LgOAj5rYPm
— Town of Milton (@TownOfMiltonON) September 1, 2020









